| [1] |
XU Huaguo.
Experimental Study on Shield Cutting Prestressed Reinforced Concrete Pipe Piles
[J]. Tunnel Construction, 2025, 45(9): 1782-1790.
|
| [2] |
LI Zhifeng, JIANG Jun, WEN Yuqin, SU Dong, ZENG Guodong, YANG Tengyu, YU Hongxin.
ThreeDimensional Numerical Simulation of
Reinforcement of Dam Crossed by OverlargeDiameter Shield Used in Jihua West Road Extension Line#br#
[J]. Tunnel Construction, 2023, 43(S2): 122-128.
|
| [3] |
YANG Litao, DENG Feng, SHI Hongbing, KUANG Lijun, CHEN Ze, YI Liwei.
Treatment Technology of Shield Passing through Anchor Cable Group: a Case Study of Shield Section of West
Extension
Line of Shenzhen Metro Line 9
[J]. Tunnel Construction, 2021, 41(S2): 494-502.
|
| [4] |
MA Xiangfeng, WANG Lichuan, GONG Lun, CHEN Libao.
Deformation and Grouting Reinforcement for Railway
Subgrade Crossed by a
DoubleTrack Metro Shield Tunnel in SandyCobble
Strata
[J]. Tunnel Construction, 2021, 41(S1): 181-.
|
| [5] |
FENG Chao, GAO Zhigang.
Rules and Control Technology of Deformation Caused by Shield Boring Crossing Underneath Existing NiQi Railway
[J]. Tunnel Construction, 2015, 35(10): 1015-1021.
|
| [6] |
LI Jianshe, CHEN Huichao, LI Zheng.
Key Construction Technologies for Shieldbored Tunnel of Chegongmiao StationHongshuwan Station Section on No. 11 Line of Shenzhen Metro Crossing Closely above Existing Metro Line
[J]. Tunnel Construction, 2014, 34(4): 374-379.
|
| [7] |
HU Xiangdong, WANG Jintai, CAO Mingliang.
Analysis on Mechanical Behavior of Frozen Soil Umbrella for Shield Junction in Qiongzhou Strait Tunnel
[J]. Tunnel Construction, 2013, 33(1): 1-8.
|
| [8] |
YUAN Fengbo.
Reinforcement of Ground Where Large Diameter Shield Machine Pauses for Long Duration under Thick Overburden
[J]. Tunnel Construction, 2012, 32(6): 882-886.
|
| [9] |
JI Guanghua.
Advance Geology Forecasting Technology Used in Tunnel Construction
[J]. Tunnel Construction, 2009, 29(增刊2): 87-91.
|
| [10] |
CHANG Hai-Song, LI Chun-Lin, CHEN Wei.
Study on Monitoring Technology and Forecasting Information
System of Shallowburied Asymmetricallyloaded Tunnels
[J]. Tunnel Construction, 2009, 29(6): 619-625.
|
| [11] |
LI Qian-Nan, TANG Ai-Ling, TUN Jian, HUANG Chao, BO Hai-Ze.
Study on Evaluation Model for Water Leakage Grades of
Tunnels Based on BP Neural Network
[J]. Tunnel Construction, 2009, 29(6): 633-635,657.
|
| [12] |
ZHI Chang-Ying, LI Yong-Sheng, LUO Tie-Fu.
Case Study on Belt Conveying Technology Applied in
Inclined Shaft of Guanjiao Tunnel
[J]. Tunnel Construction, 2009, 29(6): 653-657.
|
| [13] |
WANG Guo-Xin, XIAO Long-Ge, WANG Yu-Ling.
Discussion on Excavation Methods of Shallowcovered
Extralarge Crosssection Urban Tunnels
[J]. Tunnel Construction, 2009, 29(6): 658-663.
|
| [14] |
DAI Wei, LI He-Yong.
Construction Technology to Cope with Large Scale Deepburied
Fillingtype Karst Caves during Tunnel Construction
[J]. Tunnel Construction, 2009, 29(6): 689-693.
|
| [15] |
JIANG Dui-Can.
Causes and Countermeasures for Segment Cracks
[J]. Tunnel Construction, 2009, 29(6): 694-698.
|