Abstract:
The quality control points of each construction procedure of castinsitu bored piles were expounded. The common defects of castinsitu bored piles and their causes are summarized and countermeasures are proposed so as to minimize the quality accidents.
CLC Number:
 
U443.15+4
TU473.1+4
DING Wenyi. Construction Quality Control of Castinsitu Bored Piles[J]. Tunnel Construction, 2008, 28(1): 102-104,113.