ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2008, Vol. 28 ›› Issue (1): 70-73.DOI: B
• wenzhang • Previous Articles Next Articles
ZHONG Youxin, GUO Defu, LUO Caoyuan
Received:
Revised:
Online:
Published:
Abstract:
One inclined shaft of a tunnel on LongyanXiamen railway has long distance and steep gradient. The design, equipment selection, layout of tridimensional muck transferring between the trackless haulage system of the main tunnel and the track haulage system of the inclined shaft and safety management of the inclined shaft are presented in the paper, which can provide reference for similar works in the future.
CLC Number:
TD55
ZHONG Youxin, GUO Defu, LUO Caoyuan. Case Study on Design and Construction Technology for Track Haulage Hoist System of Huge Inclined Shaft[J]. Tunnel Construction, 2008, 28(1): 70-73.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/B
http://www.suidaojs.com/EN/Y2008/V28/I1/70