Study on Key Technologies for Fast and Safe
Construction of Deepburied Long Tunnels

HOU Yonghe1, HU Weidong2, CHEN Shougen2   

  1. 1. The 2nd Engineering Co., Ltd., China Railway the 2nd Bureau Group Co., Ltd2. Southwest Jiaotong University
  • Received:2007-11-15 Revised:2007-12-17 Online:2008-02-20 Published:2009-11-18

Abstract:

The fast and safe construction of deepburied long tunnels depends on such major constraining factors as driving length, highpressure ground water, high ground stress, high ground temperature and construction ventilation. Furthermore, the fast and safe construction of deepburied long tunnels is closely related to the construction conditions of the specific tunnel projects. On basis of the construction of the west contract section of the auxiliary traffic tunnels of Jinping hydropower works, the author analyzes on the major factors that constrain the fast and safe construction of deepburied long tunnels and investigates on the execution plans to overcome these constraining factors. The author also studies on the key technologies for fast and safe constructions of deepburied long tunnels, which include equipment matching, deep straighthole cut blasting, fast supporting and construction organization.

CLC Number: