ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2008, Vol. 28 ›› Issue (1): 82-84,92.DOI: B
• wenzhang • Previous Articles Next Articles
ZHAI Yunming
Received:
Revised:
Online:
Published:
Abstract:
The mined section of Dongdan Metro station on line 5 of Beijing Metro crosses above existing line 1 of Beijing Metro. In order to reduce the unloadingresilience resulted from the construciton of Dongdan Metro station and to control the heaving deformation of the existing Metro line within the allowable range, a series of protective measures are taken. which are presented.
CLC Number:
 
U455.4
ZHAI Yunming. Protective Measures for Construction of Metro Station Located above Existing Metro Line[J]. Tunnel Construction, 2008, 28(1): 82-84,92.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/B
http://www.suidaojs.com/EN/Y2008/V28/I1/82