ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2008, Vol. 28 ›› Issue (1): 85-88.DOI: B
• wenzhang • Previous Articles Next Articles
MENG Haifeng
Received:
Revised:
Online:
Published:
Abstract:
The construction joint Waterproofing methods of Metro works that are at present in use are described and compared in detail. The advantages and disadvantages of the Waterproofing methods are analyzed in terms of Waterproofing construction and Waterproofing effect. Three construction joint Waterproofing methods, i.e., Waterproofing by means of double expandable caulking glues and grouting pipes, Waterproofing by means of steeledged rubber water stripes and Waterproofing by means of prefabricated expandable rubber water stops, are presented. The material performances, installation methods, Waterproofing principles and application scopes of the mentioned three Waterproofing methods are described in the paper.
CLC Number:
U455.4
MENG Haifeng. Case Study on Construction Joint Waterproofing Methods of Beijing Metro Works[J]. Tunnel Construction, 2008, 28(1): 85-88.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/B
http://www.suidaojs.com/EN/Y2008/V28/I1/85