In general cases, the settingout survey of the tunnel transition sections needs some interpolation calculations made as per the designed plans, which are always very complex and contain much trivial details. The tunnel measurement system "TMS", however, provides an automatic solution for the issue.
CLC Number:
 
U452.1+3
ZHANG Xueqiang. Application of TMS in Construction Survey of Tunnel Transition Sections[J]. Tunnel Construction, 2008, 28(1): 93-96.