Application of TMS in Construction Survey of Tunnel Transition Sections

ZHANG Xueqiang   

  1. Project Management Department of Guandi Hydropower Works, Sinohydro No. 1
    Engineering Bureau
  • Received:2007-07-06 Revised:2007-10-17 Online:2008-02-20 Published:2009-11-18

Abstract:

 In general cases, the settingout survey of the tunnel transition sections needs some interpolation calculations made as per the designed plans, which are always very complex and contain much trivial details. The tunnel measurement system "TMS", however, provides an automatic solution for the issue.