On basis of analysis on the aboveground site conditions and underground geological conditions of Qigong Street Station, it is determined that opencut method should be adopted for the construction of the station. On basis of comparison and contrast of various retaining structures, it is determined that rowed piles should be adopted for the station. The loading conditions of the rowed piles under different working conditions are analyzed. The stability of the rowed piles under different conditions are expatiated.
Key words: opencut methodrowed pileretaining structure  
CLC Number:
TU473
WANG Yingjun. Simple Analysis on Retaining Structure of Qigong Street Station on Line 1 of Shenyang Metro[J]. Tunnel Construction, 2008, 28(2): 188-190,196.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/B
http://www.suidaojs.com/EN/Y2008/V28/I2/188