Abstract:
On basis of the insitu monitoring results and the measured data of ground pressure, primary reinforcement stress and structure internal force, the pattern of the huge deformation of the soft ground in the extremelyhigh groundstressed portion of Baozhen tunnel is analyzed and the corresponding construction parameters are timely adjusted, which guarantees the construction safety.
CLC Number:
U456.3
ZHANG Qunjian. Application of Monitoring Technology in Construction of Extremelyhigh Groundstressed Portion of Baozhen Tunnel[J]. Tunnel Construction, 2008, 28(2): 213-216.