Tunnel Construction ›› 2008, Vol. 28 ›› Issue (2): 213-216.DOI: B

• wenzhang • Previous Articles     Next Articles

Application of Monitoring Technology in Construction of Extremelyhigh
Groundstressed Portion of Baozhen Tunnel

ZHANG Qunjian   

  1. YichangWanzhou Railway Project Management Department, No. 1
    Engineering Co., Ltd., No. 5 Bureau Group, C.R.E.C.
  • Received:2007-09-14 Revised:2008-01-14 Online:2008-04-20 Published:2011-08-17

Abstract:

On basis of the insitu monitoring results and the measured data of ground pressure,  primary reinforcement stress and structure internal force, the pattern of the huge deformation of the soft ground in the extremelyhigh groundstressed portion of Baozhen tunnel is analyzed and the corresponding construction parameters are timely adjusted, which guarantees the construction safety.