ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2008, Vol. 28 ›› Issue (3): 336-338.DOI: B
• wenzhang • Previous Articles Next Articles
GUO Qun
Received:
Revised:
Online:
Published:
Abstract:
The design and construction of the large piperoof advance reinforcement applied in the treatment of the karsts in Nanshan tunnel are presented in the paper, with the emphasis being placed on the presentation of the construction process, safety control measures and effect assessment of the large piperoof reinforcement. The engineering practice proves that the large piperoof advance reinforcement technology is effective in the treatment of the filling karst caves. The successful engineering experience can provide reference for similar works in the future.
CLC Number:
 
U455
GUO Qun. Application of Large Piperoof Advance Reinforcement Technology in Karst Treatment Construction of Nanshan Tunnel[J]. Tunnel Construction, 2008, 28(3): 336-338.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/B
http://www.suidaojs.com/EN/Y2008/V28/I3/336