ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2008, Vol. 28 ›› Issue (3): 368-372.DOI: B
• wenzhang • Previous Articles Next Articles
BAO Li-Nan
Received:
Revised:
Online:
Published:
Abstract:
he construction technology for the intermediate piles and columns has great importance for the cutandcover construction. It is particularly the case for the cutandcover topdown construction of extralarge deep foundation pits, where the construction of the intermediate piles and columns has fundamental importance for the safety and stability of the structures. Taking the construction of the intermediate piles and columns in the cutandcover topdown construction of the transportation hub works of Tianjin Railway Station as example, the author expatiates on the construction of the extradeep borehole cast piles, the construction of the steel pipe columns and concrete works and the settlement control of the piles and columns and discusses the development and research trend of the described technology in the paper.
Key words: extralarge deep foundation pit, cutandcover topdown method, intermediate pile and column, concretesteelpipe column, largediameter and superdeep borehole cast pile, construction technology, monitoring technology, hydrostatic level
CLC Number:
TU473
BAO Li-Nan. Discussion on Construction Technology for Intermediate Piles and Columns of Extralarge Deep Foundation Pits[J]. Tunnel Construction, 2008, 28(3): 368-372.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/B
http://www.suidaojs.com/EN/Y2008/V28/I3/368