ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2008, Vol. 28 ›› Issue (4): 399-402.DOI: A
• wenzhang • Next Articles
LI Jingeng
Received:
Revised:
Online:
Published:
Abstract:
The influence of the crown settlement, horizontal convergence and structure stress on the safety of the tunnel structures is analyzed, which indicates that it is reasonable to take the crown settlement as the construction monitoring control criteria for large spanned subsea tunnels constructed by CRD method. A study is made on the construction monitoring control criteria of Xiamen Xiang’an subsea tunnel constructed by CRD method with the heading excavation sequence being in the order of 1324 and crown settlement control criteria and crown settlement rate control criteria are proposed. The research results have provided basis for the informationaided construction and insitu displacement control of Xiamen Xiang’an subsea tunnel and other similar works in the future.
CLC Number:
U459.5
LI Jingeng. Study on Displacement Control Criteria of Large Spanned Subsea Tunnel Constructed by CRD Method[J]. Tunnel Construction, 2008, 28(4): 399-402.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/A
http://www.suidaojs.com/EN/Y2008/V28/I4/399