Tunnel Construction ›› 2008, Vol. 28 ›› Issue (4): 476-478.DOI: B
• wenzhang • Previous Articles Next Articles
LI Jing
Received:
Revised:
Online:
Published:
Abstract:
The conversion from horizontal adit driving to main tunnel driving of Metro works has great construction difficulties and complex construction procedures. It is proposed, on basis of construction scheme comparison, that full-envelope construction method should be adopted for the conversion from horizontal adit driving to main tunnel driving. The works has already been successfully completed. The works practice demonstrates that full-envelope construction method can provide safe and reliable construction and significant technical, economical and social benefits. The paper can provide reference for similar works in the future.
CLC Number:
 
U231+.3
LI Jing. Comparison of Construction Schemes for Conversion from Horizontal Adit Driving to Main Tunnel Driving[J]. Tunnel Construction, 2008, 28(4): 476-478.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/B
http://www.suidaojs.com/EN/Y2008/V28/I4/476