ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2008, Vol. 28 ›› Issue (5): 628-630.DOI: B
• wenzhang • Previous Articles
LIN Chun-Gang
Received:
Revised:
Online:
Published:
Abstract:
Based on analyzing the 45t locomotive’s air circuit system, the author points out the problems in the air circuit system and makes optimizations. On the other hand, the design idea for the principle of the brake structure, the calculation of the reliability with brake force, the improvement of the air circuit system’s dryness, air quantity, pressure precision and valve are introduced. The paper can provide reference for similar air circuit systems in the future.
Key words: frequencyvariable locomotives, air circuit system, brake principle, brake force
CLC Number:
U260.9+5
TD524+.3
LIN Chun-Gang. Optimization of Air Circuit System of 45JXK DC/AC Frequencyvariable Locomotives[J]. Tunnel Construction, 2008, 28(5): 628-630.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/B
http://www.suidaojs.com/EN/Y2008/V28/I5/628