Abstract:
In this paper, the author analyzes the domestic and international situation and future of TBM/shield tunneling technology and summarizes the factors that limit the application and development of TBM/shield tunneling technology. The author states that it is of great importance to understand TBM/shield tunneling, which is featured by high investment, high technology, high efficiency and high risks. The author mainly discusses the technological trend of TBM/shield tunneling technology and suggests that the study on TBM/shield tunneling technology should focus on the following topics: 1) assistant construction methods for TBM/shield boring; 2) improving the technological performance of TBM/shield; 3) minimizing TBM/shield manufacturing cost and TBM/shield tunneling cost; 4) segment lining for TBM/shield bored tunnels. Finally, the author makes some recommendations on the organization mode of TBM/shield tunneling enterprises.
Key words: TBM/shield, high investment, high technology, high efficiency, high risk, assistant construction method, hazard forecast, automatic control, jam overcoming, cutterhead, cutting tool, segment, production organization mode
CLC Number:
U 455.3+9
GUO Shan-Yun. Comments on Application and Development of TBM/Shield Tunneling Technology[J]. Tunnel Construction, 2008, 28(6): 631-637.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/A
http://www.suidaojs.com/EN/Y2008/V28/I6/631
Key Technologies of Cutterhead Configuration and Cutter Replacement for Large diameter Shield under High Water Pressure
Fullscale Experimental Study on Bending Performance of Segmental Joints of Large Crosssection Shield Tunnel under Pure Compressive Bending Condition