Tunnel Construction ›› 2008, Vol. 28 ›› Issue (6): 688-690,735.DOI: B
• wenzhang • Previous Articles Next Articles
DAN Liu
Received:
Revised:
Online:
Published:
Abstract:
Along with the development of the immersed tunnel technology, more and more underwater tunnels are constructed by immersed tube method in China. The selection between fixed dry dock option and movable dry dock option is closely related to the project cost. Taking ShengwudaoDaxuecheng tunnel as an example, the author makes economic analysis on the fixed drydock option and movable drydock option. Taking the surrounding environment, construction conditions and schedule of the project into consideration, the author finally concludes that fixed dry dock option should be adopted for the prefabrication of the tunnel elements.
CLC Number:
 
U 455.46
DAN Liu. Economic Comparison and Contrast between Fixed Dry Dock Option and Movable Dry Dock Option: Case Study on an Immersed Tunnel in Guangzhou[J]. Tunnel Construction, 2008, 28(6): 688-690,735.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/B
http://www.suidaojs.com/EN/Y2008/V28/I6/688