ISSN 2096-4498

   CN 44-1745/U

二维码

Tunnel Construction ›› 2009, Vol. 29 ›› Issue (增刊1): 73-77.DOI: B

• wenzhang • Previous Articles     Next Articles

Cutter Support Maintenance and Cutter Modification Technology of
Shield Machine under Atmospheric Pressure

TUN Qiang-Gong   

  1. China Railway 16th Bureau Group, Beijing 100018|China
  • Received:2009-03-18 Revised:2009-03-26 Online:2009-04-15 Published:2010-04-06

Abstract:

Appropriate cutters collocation and cutters inspection and replacement in long distance TBM boring is an important and difficult point of a project. With the Yellow River Crossing works of South-to-North Water Transfer Project, this thesis will discuss on the construction technology of foundation consolidation, water level dropping in deep ground, cutter head maintenance, cutter modification, etc adopted in entering earth cabin in deep ground with high water pressure.

Key words: shield atmospheric pressure, three axes mixing pile, water level dropping with vacuum, cutter support maintenance, cutter modification

CLC Number: