LieTan section of No. 5 Line of Guangzhou Metro, which is constructed by shield machine, crosses underneath Liedeyong Bridge, No. 18 underground passage and other structures. 19 foundation piles of No. 18 underground passage intrude into the tunnel. Manualcut borehole method is adopted on basis of comparison and contrast to demolish the foundation piles intruding into the tunnel, which guarantees the safety of the underground passage structure and the successful boring of the shield machine.
CLC Number:
 
U 455
DU Chuangdong. Technology of Treatment of Pile Foundations Intruding into Shield Tunnel by means of Manualcut Borehole Method[J]. Tunnel Construction, 2009, 29(2): 222-226.