Tunnel Construction ›› 2009, Vol. 29 ›› Issue (2): 246-248.DOI: B
• wenzhang • Previous Articles Next Articles
YU Xuping
Received:
Revised:
Online:
Published:
Abstract:
Taking doubleshield TBM TB593E/TS used in Diversion of Datong River to Huangshui River Project in Qinghai as an example, the author introduces the technology and application condition of doubleshield TBM in this paper. Then, the author, based on the analysis of design defects in cutterheard, host machine, segment erection system and backup system, puts forward some suggestions on design and construction of doubleshield TBM. This paper can provide reference for the design and construction of doubleshield TBM in the future.
CLC Number:
U 455
YU Xuping. Technique for Doubleshield TBM Design and Construction[J]. Tunnel Construction, 2009, 29(2): 246-248.