The Key Construction Technologies of Xingwangmao Tunnel

ZHANG  Long   

  1. The First Engineering Co., Ltd. of China Railway Tunnel Group
  • Received:2009-03-03 Revised:2009-03-30 Online:2009-06-20 Published:2009-09-08

Abstract:

Based on the construction of Xingwangmao tunnel on SJSV section of the doubletrack TaiyuanZhongwei (Yinchuan) railway, the author presents the construction technologies and experiences for the shallowburied portal section, waterrich and intenseweathered mudstone section, alternative sandstone layers and roof ripping of No.3 inclined shaft. During the tunnel construction, the construction scheme was optimized based on the geologic conditions and the actual construction aims analysis and utilization of advantages of traditional construction methods. The optimized scheme has ensured the construction safety and construction schedule.