ISSN 2096-4498

   CN 44-1745/U

二维码

Tunnel Construction ›› 2009, Vol. 29 ›› Issue (4): 427-430.DOI: A

• wenzhang • Previous Articles     Next Articles

Application of Karst Development Mechanism Study in Advance Forecasting of Karst during Tunnel Construction

LI Zhuojun, CHEN Jianping   

  1. Engineering College, China University of Geosciences
  • Received:2009-06-04 Revised:2009-06-30 Online:2009-08-20 Published:2010-04-20

Abstract:

It is of great necessity and importance to make advance karst prediction during tunnel construction in karst area. Researching on the karst development mechanisms, which falls in the scope of geological analysis methods, plays a basic and guiding role in the advance karst prediction in tunnel construction. The authors introduce the task of advance geological prediction in karst tunnel and the status of study on karst development mechanisms in this paper. Furthermore, taking Changleshan tunnel as an example, they study on the karst development and distribution pattern. On basis of the study results, they make geological forecasts and explain the forecast results, which achieves good prediction results.

Key words:  karst development mechanisms, advance forecast, tunnel in karst ground

CLC Number: