ISSN 2096-4498

   CN 44-1745/U

二维码

Tunnel Construction ›› 2009, Vol. 29 ›› Issue (4): 475-480.DOI: B

• wenzhang • Previous Articles    

Analysis and Application of Coordinates Back Calculation in Tunnel Survey

SHI Jixun   

  1. The 3rd Engineering Co., Ltd. of China Railway Tunnel Group
  • Received:2009-06-12 Revised:2009-07-16 Online:2009-08-20 Published:2010-04-20

Abstract:

Based on the analysis of the geometric characteristics of the contour line and plan curve of tunnel crosssections, the author makes further study on the straight line, circular curve and transition curve of the plan curve. Then, the author works out a coordinate back calculation program for those 3 curves by CASIO fx4800 calculator. The mileage and deviation distance are calculated by the mentioned back calculation program. On basis of the calculation program for the overbreak and underbreak, accurate settingout and checking of the tunnel can be performed. This method can also be used for the settingout and checking of other structures of tunnels.

Key words: tunnel, plan curve and horizontal curve, coordinate back calculation, program

CLC Number: