ISSN 2096-4498

   CN 44-1745/U

二维码

Tunnel Construction ›› 2009, Vol. 29 ›› Issue (6): 636-640,667.DOI: A

• wenzhang • Previous Articles     Next Articles

Analysis on Measurement Results of Stresses and Strains of Concrete
Retaining Walls of "U"shaped Road Channel

WEN Xin-Liang   

  1. The 2nd Engineering Co., Ltd. of China Railway Tunnel Group, Sanhe 065201, Hebei, China
  • Received:2009-11-19 Revised:2009-12-17 Online:2009-12-20 Published:2010-01-06

Abstract:

n order to cope with the cracks of the concrete retaining walls of the "U"shaped road channel from DK35+607 to DK36+028 on LongyanXiamen Railway, embedded concrete strain gauges are used to measure the concrete strains. The distribution pattern and timedependent varying pattern of the internal stresses and strains of the concrete are obtained. The position, time and cause for the probable cracking zones of the concrete retaining walls are analyzed and countermeasures are proposed to control the cracks. This paper can provide reference for similar projects in the future.

Key words: ", U", shaped road channel concrete retaining wall embedded strain gauge stress strain measurement analysis

CLC Number: