| [1] |
ZHAO Xiaoyong, LI Guoliang, WANG Xindong, GAO Xinqiang, XIONG Wei, GUO Xiansuo.
Mechanical Properties of Prefabricated Inverted Arch Structures in Railway Tunnels During Construction
[J]. Tunnel Construction, 2026, 46(4): 828-839.
|
| [2] |
YAO Hongzhi, WANG Han, BAI Dongfeng, SHI Baotong, ZHENG Wankun, ZHANG Caifei, HAN Xingbo.
Comparative Analysis of Construction Excavation Schemes and Support Parameters for Ultra-Large-Span Underground Storage Tank Space
[J]. Tunnel Construction, 2025, 45(S2): 289-301.
|
| [3] |
CHEN Zhen.
Experimental Study on On-Site Preparation of Novel Karst Cave Filler Using Shield Waste Sandy Clay
[J]. Tunnel Construction, 2025, 45(S1): 23-31.
|
| [4] |
HUANG Shuhua.
Key Construction Technology and Application Practice
of Mechanized Connecting Passage of a Super-Large Diameter Shield Tunnel in Complex Water-Rich Strata
[J]. Tunnel Construction, 2025, 45(S1): 280-289.
|
| [5] |
HONG Chengyu, ZHOU Ziping, LOU Zaiming, GUO Zhen, TAN Junqing, SU Dong.
Geotechnical Investigation
Method Based on Distributed Acoustic Sensors
[J]. Tunnel Construction, 2025, 45(1): 171-178.
|
| [6] |
GUO Ming, WU Jie, ZHOU Lun.
Influence of Top Concealed Karst Cave on Deformation Characteristics of Tunnel Rock: A Case Study of Qiyueshan Expressway
Tunnel
[J]. Tunnel Construction, 2024, 44(S1): 211-223.
|
| [7] |
XIAN Guo, ZOU Yongmu, LI Xiaobing, WANG Guan, WANG Yangyang.
Integrated Application and
Some Issues of Modern Tunneling Technology
for Chengdu-Kunming Railway Tunnel
[J]. Tunnel Construction, 2024, 44(8): 1713-1722.
|
| [8] |
LI Pengfei, QIU Jinrun, WANG Limin, SHUAI Yubing, WANG Xijun, ZHANG Mingju, WANG Hao.
Mechanized Construction of Wastewater Pump Room in
Shield Tunnel
[J]. Tunnel Construction, 2022, 42(S1): 404-412.
|
| [9] |
LIU Zhitao, ZHANG Jingjing, WANG Lichuan, LIU Xupeng, HUA Wei.
Construction Control Technology of Shield Tunneling
underneath BrickandConcrete
Residential Buildings: a Case Study of Phase Ⅲ Project of Hefei Rail Transit Line 1
[J]. Tunnel Construction, 2022, 42(S1): 427-432.
|
| [10] |
ZHAO Shaozhong, HUANG Xin, XU Zhenhao, LI Minghai.
Development Characteristics and Treatment Techniques
of Karst Caves in Qiyueshan Tunnel
[J]. Tunnel Construction, 2022, 42(7): 1289-1299.
|
| [11] |
ZHANG Yazhou, YAO Zhanhu, WEI Chi, ZHANG Xiying, ZHAO Xiaopeng, WU Ronghua, CHENG Xiaoqing.
Discussion on Main Issues of Shield Tunnel
Waterproofing Technology and Its Future Prospect
[J]. Tunnel Construction, 2022, 42(11): 1832-1843.
|
| [12] |
WANG Shimin, LIN Zhiyu, WANG Xianming, CHEN Bing, SHE Youguang.
Disturbance Analysis on Existing Shield Tunnel under Collapse
of Overlying Sand Layer Induced by Karst Cave
[J]. Tunnel Construction, 2021, 41(S2): 75-83.
|
| [13] |
ZHENG Jieyuan, WANG Yong, QING Weichen.
Roof Protection Technology for Giant Karst Cave in
Yujingshan Tunnel of ChengduGuiyang
HighSpeed Railway
[J]. Tunnel Construction, 2021, 41(S2): 413-420.
|
| [14] |
ZHU Jianwei, ZHU Jianguo.
Comprehensive Treatment Techniques for Karst Caves in Xiaosanxia
Tunnel of ZhengzhouWanzhou HighSpeed Railway
[J]. Tunnel Construction, 2021, 41(S1): 401-.
|
| [15] |
LIU Jianyou, LYU Gang, ZHAO Yong, YUE Ling.
Environmental Protection Techniques for New Badaling
Tunnel of BeijingZhangjiakou HighSpeed Railway Crossing Scenic and Historic Interest Area
[J]. Tunnel Construction, 2021, 41(8): 1361-.
|