ISSN 2096-4498

   CN 44-1745/U

二维码

Tunnel Construction ›› 2009, Vol. 29 ›› Issue (增刊2): 114-116,176.DOI: B

• wenzhang • Previous Articles     Next Articles

Application of Corekeeping Ring Cut Method in Yangtaishan Tunnel

KANG Tiejun   

  1. The 3rd Engineering Co., Ltd. of China Railway Tunnel Group, Shenzhen 518109, Guangdong, China
  • Received:2009-06-29 Revised:2008-09-07 Online:2009-09-30 Published:2010-01-04

Abstract:

The application of corekeeping ring cut method in the excavation of the shallowburied section of Yangtaishan tunnel is presented, with the emphasis being placed on the presentation of the construction techniques of the optimized corekeeping ring cut method. The advantages and application scopes of the optimized corekeeping ring cut method is also presented. This paper can provide reference for tunneling colleagues.

CLC Number: