Tunnel Construction ›› 2009, Vol. 29 ›› Issue (增刊2): 144-147.DOI: B
• wenzhang • Previous Articles Next Articles
GE Quping 1, LIU Chuanwen2
Received:
Revised:
Online:
Published:
Abstract:
Taking the construction of No.1 and No.2 inclined shafts and main body of Xingwangmao tunnel on SJSV bid section of TaiyuanZhongwei double track railway located in fully/heavilyweathered waterrich sandstone and waterbearing sand stratum as an example, the authors present the construction technology for the rapid tunneling in fully/heavilyweathered waterrich sandstone and waterbearing sand stratum, after analyzing the traditional construction technology under the specific geological conditions. The authors recommend the rapid tunneling concept, which consists of strengthening the management details, increasing labor forces, making full use of existing equipment, executing parallel construction by developing multiple working faces, making full use of various resources and minimizing construction cycle time. Finally, they present the social and economic benefits of rapid, safe and high efficient construction.
CLC Number:
U 455
GE Quping , LIU Chuanwen. Rapid Construction Technology for Tunnels in Fully/Heavilyweathered Waterrich Sandstone and Waterbearing Sand Strata[J]. Tunnel Construction, 2009, 29(增刊2): 144-147.
/ Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/B
http://www.suidaojs.com/EN/Y2009/V29/I增刊2/144