ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2009, Vol. 29 ›› Issue (增刊2): 153-157.DOI: B
• wenzhang • Previous Articles Next Articles
LAN Yang
Received:
Revised:
Online:
Published:
Abstract:
Yangjiao tunnel in B6 contract section of WulongShuijiang section of ChongqingChangsha expressway is an extralong tunnel with large crosssection. The tunnel has great construction difficulties, great technical complexity and high technical requirements. Double side drift tunneling method is selected on basis of the site conditions and parameter analysis by loadstructure method. Special attention is paid to the monitoring and setting of the preserved deformation volume during tunnel construction. Finally the tunnel crosses the soft ground section successfully and the overall deformation is effectively controlled. The construction technology for Yangjiao tunnel by double side drift tunneling method is presented in the paper, which can provide reference for similar projects in the future.
CLC Number:
U 455
LAN Yang. Construction of Yangjiao Tunnel with Large CrossSection by Double Side Drift Tunneling method[J]. Tunnel Construction, 2009, 29(增刊2): 153-157.
/ Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/B
http://www.suidaojs.com/EN/Y2009/V29/I增刊2/153