Tunnel Construction ›› 2010, Vol. 30 ›› Issue (2): 125-127,161.DOI: B
• wenzhang • Previous Articles Next Articles
SU Rui1, LIU Xiao-Xiang2, GAO Wen-Shan1
Received:
Revised:
Online:
Published:
Abstract:
The arrangement of the conveyor belts, flexible ventilation ducts, water supply pipes and high voltage cables for West Qinling tunnel with belt conveyor mucking system, which is constructed by TBMs, is presented in the paper. The design of the fullface hydraulic lining formwork jumbo is described. The paper can be served as reference for similar projects in the future.
Key words: West Qinling tunnel, TBM, belt conveyor, full face hydraulic lining formwork jumbo, utility line arrangement, simultaneous lining
CLC Number:
U 455.3+9
SU Rui, LIU Xiao-Xiang, GAO Wen-Shan. Case Study on Simultaneous Lining Construction Technology for West Qinling Railway Tunnel Constructed by TBM[J]. Tunnel Construction, 2010, 30(2): 125-127,161.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/B
http://www.suidaojs.com/EN/Y2010/V30/I2/125
Design and Analysis of a New TBM Propulsion System with Small Turning Radius
Dynamic Model and Vibration Analysis of TBM Edge Disccutter Based on MATLAB/Simulink