Rule of Timedependent Stress of Tunnels in Wet Subsidence
Loess Constructed by 3bench Excavation Method

ZHOU Ye1,2, LIU Zhong-Ren3, LIU Xin-Beng3, HU Suo-Bin3   

  1. 1. LanzhouChongqing Railway Project Headquarters of China Railway 19th
    Bureau Group Co., Ltd., Dingxi 743001, Gansu, China|
    2. School of Civil Engineering and Architecture, Beijing Jiaotong University, Beijing 100044, China|
    3. LanzhouChongqing Railway Co., Ltd., Lanzhou 730050, China
  • Received:2010-01-04 Revised:2010-04-01 Online:2010-04-20 Published:2010-05-25

Abstract:

The rule of the timedependent strains of the tunnels in wet subsidence loess ground is revealed by means of monitoring of the wet subsidence loess ground. A kind of 3bench construction method is developed on basis of the rule of the timedependent strains. The deformation behavior of the tunnels constructed by 3bench excavation method is summarized as follows: After top heading excavation, the tunnel stability can maintain 7 days before settlement occurs; During the excavation of the second bench, the controlled settlement of the primary reinforcement structure of the top heading is allowed, which is a stress releasing process; The settlement deformation caused by the third bench excavation is similar to that caused by the second bench excavation; When the ring is closed after invert installation, the ground tends to be stable. 3bench construction is executed under the guidance of the above deformation rule in the construction of LanzhouChongqing railway and satisfactory effects have been achieved.

Key words: wet subsidence loess, tunnel, 3 bench method, time dependent stress, rule