Tunnel Construction ›› 2010, Vol. 30 ›› Issue (2): 131-133,178.DOI: B
• wenzhang • Previous Articles Next Articles
CUI Xiao-Feng1, SUN Shao-Feng2, WANG An-Hong2, HOU Min1
Received:
Revised:
Online:
Published:
Abstract:
CRD excavation method and 3bench 7step excavation method are compared, analyzed and evaluated in the paper. Furthermore, a new excavation method, i.e., bench method with core soil and temporary invert is proposed so as to enrich the tunnel excavation method.
Key words: CRD excavation method, 3 bench 7 step excavation method, bench method with core soil and temporary invert
CLC Number:
U 455.4
CUI Xiao-Feng, SUN Shao-Feng, WANG An-Hong, HOU Min. Comparison and Contrast between CRD Excavation Method and 3bench 7step Excavation Method and Their Optimization[J]. Tunnel Construction, 2010, 30(2): 131-133,178.