Comparison and Contrast among Different Construction
Methods for Doubletrack Railway Tunnels in Soft Ground

XU Yong1, LIU Zhong-Ren2, WANG Wei-Gao2, KOU Jiang1   

  1. 1. CCCC Second Highway Engineering Co., Ltd., Xi'an 710065, China;
    2. LanzhouChongqing Railway Co., Ltd., Lanzhou 730050, China
  • Received:2010-01-13 Revised:2010-03-13 Online:2010-04-20 Published:2010-05-25

Abstract:

Serious settlement, convergence and deformation always occur during the construction of doubletrack railway tunnels located in soft ground. 3bench 7step construction method, CRD construction method and enlargedarchfoot bench method are adopted in the construction of Liangshui tunnel on LanzhouChongqing railway. These three construction methods are compared in terms of safety, advance rates and equipment availability. It is concluded that enlargedarchfoot bench method is more suitable for the construction of doubletrack railway tunnels located in soft ground.

Key words: tunnel in soft ground, deformation control, monitoring, enlarged arch foot bench method