ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2010, Vol. 30 ›› Issue (2): 157-161.DOI: B
• wenzhang • Previous Articles Next Articles
ZHANG Wen-Jiang1, WANG Qiang-Lin2, LI Jian-Wei1, GAO Pan1
Received:
Revised:
Online:
Published:
Abstract:
he large deformation occurring during the construction of the inclined shafts of Muzhailing tunnel on LanzhouChongqing railway located in soft ground with high ground stress is presented. Analysis is made on the large deformation on basis of the geological conditions, reinforcement structures, construction process and monitoring data. Effective and reasonable reinforcement measures are proposed in accordance with the site conditions and the theoretical analysis. The technical trend for the subsequent construction of the tunnel in soft ground is provided. The paper can be served as guidance for the subsequent construction of the tunnel and as reference for similar projects in the future.
Key words: high ground stress, soft ground, large deformation, control technology
CLC Number:
U 455.4
ZHANG Wen-Jiang, WANG Qiang-Lin, LI Jian-Wei, GAO Pan. Case Study on Large Deformation Control Technology of Muzhailing Tunnel[J]. Tunnel Construction, 2010, 30(2): 157-161.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/B
http://www.suidaojs.com/EN/Y2010/V30/I2/157