ISSN 2096-4498

   CN 44-1745/U

二维码

Tunnel Construction ›› 2010, Vol. 30 ›› Issue (2): 162-168,178.DOI: B

• wenzhang • Previous Articles     Next Articles

Case Study on TBM Stepping Modes in West
Qinling Tunnel on LanzhouChongqing Railway

CHEN Da-Jun   

  1. Project Headquarters of XQLS2 Bid Section of West Qinling tunnel on LanzhouChongqing
    Railway, China Railway Tunnel Group, Wudu 746042, Gansu, China
  • Received:2010-01-08 Revised:2010-02-20 Online:2010-04-20 Published:2010-05-25

Abstract:

West Qingling tunnel is constructed by TBM tunneling method assisted by drill and blast method. The stepping of TBM through the tunnel section constructed by drill and blast method is presented. The mode of stepping with arcshaped slide way and thrust cylinder and the mode of stepping with integral support frame and electrical motor drive are described in terms of technical features, key control points and operation methods. The two stepping modes are compared in terms of advantages and disadvantages. Finally, the mode of stepping with arcshaped slide way and thrust cylinder is chose.

Key words: West Qinling tunnel, TBM, arc shaped slide way, electrical motor drive, stepping technology

CLC Number: