West Qingling tunnel is constructed by TBM tunneling method assisted by drill and blast method. The stepping of TBM through the tunnel section constructed by drill and blast method is presented. The mode of stepping with arcshaped slide way and thrust cylinder and the mode of stepping with integral support frame and electrical motor drive are described in terms of technical features, key control points and operation methods. The two stepping modes are compared in terms of advantages and disadvantages. Finally, the mode of stepping with arcshaped slide way and thrust cylinder is chose.
Key words: West Qinling tunnel, TBM, arc shaped slide way, electrical motor drive, stepping technology
CLC Number:
U 455.4
CHEN Da-Jun. Case Study on TBM Stepping Modes in West Qinling Tunnel on LanzhouChongqing Railway[J]. Tunnel Construction, 2010, 30(2): 162-168,178.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/B
http://www.suidaojs.com/EN/Y2010/V30/I2/162
Design and Analysis of a New TBM Propulsion System with Small Turning Radius
Dynamic Model and Vibration Analysis of TBM Edge Disccutter Based on MATLAB/Simulink