ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2010, Vol. 30 ›› Issue (2): 182-185,198.DOI: B
• wenzhang • Previous Articles Next Articles
XU Jing1, WANG An-Hong2, NIU Gang1, CHEN Jian1
Received:
Revised:
Online:
Published:
Abstract:
Regarding the construction of the connection section between the horizontal adit and the main tube of Liangshui tunnel on LanzhouChongqing railway, two construction schemes are presented and analyzed in the paper. In the end, the first scheme is adopted. The technical measures taken in the construction are described. The construction practice demonstrates that the construction scheme adopted is suitable for the construction of the connection section between the horizontal adit and the main tunnel in soft ground.
Key words: Liangshui tunnel, tunnel in soft ground, connection section between horizontal adit and main tunnel, pilot tunnel, construction scheme selection
CLC Number:
U 455
XU Jing, WANG An-Hong, NIU Gang, CHEN Jian. Selection of Construction Scheme for Connection Section between Horizontal Adit and Main Tunnel in Soft Ground[J]. Tunnel Construction, 2010, 30(2): 182-185,198.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/B
http://www.suidaojs.com/EN/Y2010/V30/I2/182