ISSN 2096-4498

   CN 44-1745/U

二维码

Tunnel Construction ›› 2010, Vol. 30 ›› Issue (2): 195-198.DOI: B

• wenzhang • Previous Articles     Next Articles

Construction Technology for Swallowtailshaped
Section inside Fanjiaping Railway Tunnel

XIAO Yan-Xia   

  1. LanzhouChongqing Railway Project Headquarters of China Railway 18th
    Bureau Group Co., Ltd., Wudu 746000, Gansu, China
  • Received:2010-01-04 Revised:2010-03-17 Online:2010-04-20 Published:2010-05-25

Abstract:

Technology of roof ripping from the singletrack section and technology of lining construction for the largespanned section are presented in the paper, with the construction of the swallowtailshaped section of Fanjiaping tunnel on LanzhouChongqing railway as an example. In the end, satisfactoryresults are achieved. The paper can be served as reference for similar projects in the future.

CLC Number: