ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2010, Vol. 30 ›› Issue (3): 257-261.
• wenzhang • Previous Articles Next Articles
BANG Ling-Xing, SHU Zi-Jiang, MI Shi-Wen
Received:
Revised:
Online:
Published:
Abstract:
It is recommended that comprehensive fuzzy evaluation method should be used in the geology forecast of tunnel works so as to make full use of all kinds of geology forecast methods and draw a relatively correct conclusion. The application of comprehensive fuzzy evaluation method in the geology forecast of tunnel works is presented in terms of the establishment of the factor set and evaluation set and the obtaining of the relative weight of the various factors on basis of engineering cases. The engineering practice verifies that the evaluation method is feasible.
Key words: comprehensive fuzzy evaluation method, tunnel, geology forecast, water bearing of rock mass
BANG Ling-Xing, SHU Zi-Jiang, MI Shi-Wen. Application of Comprehensive Fuzzy Evaluation Method in Waterbearing Forecast in Tunnel Works[J]. Tunnel Construction, 2010, 30(3): 257-261.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/
http://www.suidaojs.com/EN/Y2010/V30/I3/257
Key Technologies of Cutterhead Configuration and Cutter Replacement for Large diameter Shield under High Water Pressure
Experimental Effect Prediction of Ground Conditioning of Water rich Sandy Stratum Based on BP Neural Network
Fullscale Experimental Study on Bending Performance of Segmental Joints of Large Crosssection Shield Tunnel under Pure Compressive Bending Condition
Study on Optimization of Emergency Rescue Station of Yuntunbao Tunnel on ChengduLanzhou Railway
Launching and Receiving Technology of Large Crosssection Horseshoeshaped Shield Used in Baicheng Tunnel
Design and Analysis of a New TBM Propulsion System with Small Turning Radius
Study on Key Technologies and Application of Engineering Big Data Management Platform of Tunnel Boring Machine
Improvement Technology of Bearing Capacity of Prestressed Anchor Cable in Large span Tunnel: a Case Study on Badaling Great Wall Station