Tunnel Construction ›› 2010, Vol. 30 ›› Issue (3): 285-291.
• wenzhang • Previous Articles Next Articles
SHANG Chong-Lun
Received:
Revised:
Online:
Published:
Abstract:
Regarding the construction of Qiyueshan tunnel on YichangWanzhou railway, which passes through F11 fault, comparison and contrast are made on freezing method, energyreleasing and pressurereducing method and consolidating and waterblocking grouting method. In the end, the optimized method of waterreleasing and pressurereducing and informationaided grouting is adopted after scientific studies and engineering practice. The waterreleasing tunnel and parallel drift are used as waterreleasing and pressurereducing passages to reduce the water pressure and minimize the water/mud burst risks. Accurate informationaided grouting is executed to consolidate the surrounding rock mass, which is followed by rapid excavation and rapid sealing so as to tunneling through the fault safely and rapidly. In this way, the difficult problem of rapid tunneling through faults containing rich highpressure water in karst areas is successfully solved. The technology described in the paper can be promoted for similar works.
Key words: fault containing rich high pressure water, water releasing and pressure reducing, pipe roof installed without working chamber, rapid excavation and rapid sealing, Qiyueshan tunnel
SHANG Chong-Lun. Key Construction Technology for Qiyueshan Tunnel on YichangWanzhou Railway in Fault Containing Rich Highpressure Water[J]. Tunnel Construction, 2010, 30(3): 285-291.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/
http://www.suidaojs.com/EN/Y2010/V30/I3/285