Case Study on Construction Ventilation Mode of No. 3
Inclined Shaft Working Lot of Baojiashan Tunnel
MU Qian-Xiang1, CAO Qi-Cai1, XIAO Yuan-Beng2
1. XiaoheAnkang Highway Management Department, Shaanxi Provincial
Communication Construction Group, Ankang 725000, Shaanxi, China;
2. Scientific Research Institute under China Railway Tunnel Group, Luoyang 471009, Henan, China
MU Qian-Xiang, CAO Qi-Cai, XIAO Yuan-Beng. Case Study on Construction Ventilation Mode of No. 3
Inclined Shaft Working Lot of Baojiashan Tunnel[J]. Tunnel Construction, 2010, 30(3): 336-338,343.