Tunnel Construction ›› 2010, Vol. 30 ›› Issue (4): 430-433.
• wenzhang • Previous Articles Next Articles
ZHANG Xuan, Zhang-Ding-Li, Li-Feng-Fei
Received:
Revised:
Online:
Published:
Abstract:
Analysis is made on the causes for the ground surface collapse, large deformation of primary reinforcement structure, excessive crown settlement and horizontal convergence of tunnel in poor geological sections in loess, with a large crosssection tunnel in loess on LanzhouChongqing railway as an example. Countermeasures, including ground consolidation by installing jet grouting piles from the ground surface, advance grouting executed in tunnel and improving the strength of the primary reinforcement structure, are recommended on basis of the geological conditions in the ground surface collapse section and numerical simulation results. The paper can be served as reference for similar projects in the future.
Key words: loess tunnel, ground surface collapse, numerical simulation, monitoring
ZHANG Xuan, Zhang-Ding-Li, Li-Feng-Fei. Analysis on Causes for Ground Surface Collapse Induced by Excavation of Tunnel in Loess and Study on Construction Countermeasures[J]. Tunnel Construction, 2010, 30(4): 430-433.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/
http://www.suidaojs.com/EN/Y2010/V30/I4/430
Study on Key Technologies and Application of Engineering Big Data Management Platform of Tunnel Boring Machine
Noise Propagation Characteristics of Tunnel Construction by Drilling and Blasting Method