Tunnel Construction ›› 2010, Vol. 30 ›› Issue (4): 434-438.
• wenzhang • Previous Articles Next Articles
LI Guo-Qing
Received:
Revised:
Online:
Published:
Abstract:
In order to analyze the existing problems of transfer stations of Beijing Metro, the existing design of transfer stations of Beijing Metro is studied in terms of transfer distance, transfer time, transfer mode, peopleoriented design and barrierfree transfer. Some significant suggestions are made for Metro design on basis of comparison between the proposed design and the existing design of transfer stations and summarization of the design experiences of transfer station in the past.
LI Guo-Qing. Stateofart of Design of Transfer Stations of Beijing Metro and Some Suggestions[J]. Tunnel Construction, 2010, 30(4): 434-438.