| [1] |
FENG Tugen, YUE Chenlong, ZHANG Jian, HU Jinjian, XUE Xinkai, ZHENG Bin.
Performance Improvement of Shield Tunneling by Integrating Machine Learning and Multi-Objective Optimization
[J]. Tunnel Construction, 2026, 46(S1): 67-77.
|
| [2] |
JIN Ming, WANG Shouqiang, YAO Yinbin, DAI Peng, XIAO Liang.
Multi-Objective Optimization of Shield Disc Cutter Layout Based on an Improved Conical Shield Model
[J]. Tunnel Construction, 2026, 46(S1): 123-133.
|
| [3] |
WANG Shilong, GAO Baobin, WANG Xinzhuang, CAO Yongjing, ZHANG Changjuan, YANG Dongjie.
Cutterhead Jamming Mechanism and Prevention Strategy for an Open-Type TBM Crossing Collapse Columns
[J]. Tunnel Construction, 2026, 46(S1): 348-360.
|
| [4] |
QI Mengxue, XIA Yimin, LI Fengwei, ZHOU Yanling, ZENG Shaoyi, ZHOU Bo, SONG Hongjiao, YUAN Jincai.
Key Technologies for TBM Equipment and Construction in Intact Hard Rock Spiral Tunnels
[J]. Tunnel Construction, 2026, 46(S1): 529-539.
|
| [5] |
CHEN Shaolin, XIAO Jing, XU Chao, ZHENG Jiajia, XU Huaguo.
Experimental Study on Rock Breaking by Triple-Disc Cutters With Different Cutter Profiles
[J]. Tunnel Construction, 2026, 46(8): 1640-1649.
|
| [6] |
WANG Yi, ZHENG Wenbao, LUO Gang, LIU Jianping.
Multi-Objective Optimization of a Large-Diameter Shield Cutterhead System and Tunneling Parameters in Complex Strata
[J]. Tunnel Construction, 2026, 46(5): 1109-1120.
|
| [7] |
REN Guoping, ZHANG Jian, FENG Tugen, YU Xuejuan, ZHANG Wenchao, FANG Yuan.
A Dual-Path Prevention and Control Method for Mud Cakes on Shield Cutterhead in Highly Viscous Formations Based on Dispersant Treatment
[J]. Tunnel Construction, 2026, 46(3): 562-575.
|
| [8] |
HAO Sihaowensong, LI Shuchen, LI Xuewei, LIU Richeng, YIN Weifang, XU Kechun.
Experimental Simulation of Electrochemical Synergistic De-adhesion for Mitigating Shield Cutterhead Clogging in Clayey Strata
[J]. Tunnel Construction, 2026, 46(3): 586-598.
|
| [9] |
QI Wencong.
Regional Analysis of Disc Cutter Consumption and Failure of a TBM Conical Cutterhead in Spiral Ramp of Beishan Underground Laboratory
[J]. Tunnel Construction, 2026, 46(2): 322-335.
|
| [10] |
HU Junwei.
Composite Rock Fragmentation Technology Using Blasting Presplitting and Disc Cutters for Highly Intact and Extremely Hard Rock
[J]. Tunnel Construction, 2026, 46(2): 394-405.
|
| [11] |
XU Guangyi, QI Zhichong, ZHAO Zihui, JIA Tao, LI Ming, WU Hao, GENG Qi.
Design and Testing of a Cone-Shaped Cutterhead Based on Boring Method for Enlarged-Diameter Vertical Shafts
[J]. Tunnel Construction, 2026, 46(1): 194-203.
|
| [12] |
LU Yao, HUANG Ming, GUAN Zhenchang, ZHOU Qi, SONG Hui, ZHENG Jinhuo, CAI Guangyuan.
Thermo-Mechanical Coupling Characteristics of EPB Shield Cutterhead Considering Foam-Conditioned Effect
[J]. Tunnel Construction, 2025, 45(S2): 222-235.
|
| [13] |
ZHU Ying, LI Jianbin, CAO Chenxu, NIAN Junjie, YOU Weixing.
Novel Cutterhead Design for Cantilever TBMs
[J]. Tunnel Construction, 2025, 45(S2): 365-370.
|
| [14] |
LI Kaikai, DAI Shunyi, YUAN Wenzheng, WU Hao, ZHANG Penghao, ZHAI Cong.
Design and Analysis of New Detachable Lifting Lug Used in Cutterhead of Shield
[J]. Tunnel Construction, 2025, 45(S2): 371-379.
|
| [15] |
XU Huaguo.
Experimental Study on Shield Cutting Prestressed Reinforced Concrete Pipe Piles
[J]. Tunnel Construction, 2025, 45(9): 1782-1790.
|