[1] |
CHEN Jian, XUE Feng, SU Xiuting, LU Yao, LIU Tao.
Key Technologies of Cutterhead Configuration and
Cutter Replacement for Large diameter
Shield under High Water Pressure
[J]. Tunnel Construction, 2020, 40(7): 1057-1065.
|
[2] |
GONG Tingmin, JIA Lianhui, CHEN Wentao, ZHENG Yongguang.
Key Technologies of Hard Rock Slurry Balance Pipe
Jacking Machine for Composite Ground
[J]. Tunnel Construction, 2020, 40(6): 880-889.
|
[3] |
ZHANG Binrong, GUAN Huisheng, TAN Xiaofeng, LIAO Jiang, YANG Xiao, LI Xia.
Dynamic Model and Vibration Analysis of TBM Edge Disccutter
Based on MATLAB/Simulink
[J]. Tunnel Construction, 2020, 40(6): 833-839.
|
[4] |
WANG Famin, SUN Zhenchuan, ZHANG Lianghui, LI Fengyuan, ZHANG Bing, WANG Guo′an.
Design of Super-large Diameter Slurry Shield Used in Shantou Bay Tunnel and Construction Countermeasures for Unfavorable Geology
[J]. Tunnel Construction, 2020, 40(5): 735-746.
|
[5] |
FANG Zhongyu.
Design and Application of Online Temperature Monitoring System for
Cutterhead of Large-diameter Slurry Shield under Atmospheric Pressure:
a Case Study on Wangjiang Road River-crossing Tunnel Project in Hangzhou
[J]. Tunnel Construction, 2020, 40(4): 586-590.
|
[6] |
XU Huaguo, CHEN Kui, SUN Zhenchuan.
Laboratory Test of Reinforced Concrete Pile Foundation Cutting by Shield Cutterhead
[J]. Tunnel Construction, 2020, 40(1): 35-42.
|
[7] |
ZHANG Binrong, GUAN Huisheng, ZHAO Changsheng, WANG Mo.
Finite Element Simulation Analysis of Rock Breaking Test Platform for Dualmode TBM Cutter
[J]. Tunnel Construction, 2019, 39(S1): 290-295.
|
[8] |
LI Fengyuan, YANG Yandong, XU Huaguo.
Key Technologies for Shield Cutting Plastic Drainage Plate in Consolidated Clay
[J]. Tunnel Construction, 2019, 39(6): 913-918.
|
[9] |
HUANG Zhigao, CHEN Peng, HE Yuanfu, LIU Gang, ZHU Xiaotian.
Load and Torque Calculation and Mechanical Performance Analysis of Cutterhead of a 12 m Slurry Shield
[J]. Tunnel Construction, 2019, 39(6): 1021-1029.
|
[10] |
KONG Shaobo.
Design and Optimization for Cutterhead of an Extralarge Diameter Slurry Shield Boring in Submarine Complex Strata
[J]. Tunnel Construction, 2019, 39(6): 1030-1037.
|
[11] |
ZHANG Bing, YANG Yandong, SUN Zhenchuan, MA Liang.
Construction Technology and Countermeasures for TBM Boring in Broken Ground of Gaoligongshan Tunnel
[J]. Tunnel Construction, 2019, 39(5): 851-857.
|
[12] |
TIAN Yanchao, HE Fei, ZHANG Xiao, YANG Tianren.
Overcutting Design for TBM Cutterhead in Longdistance Boring in Soft Rock Condition
[J]. Tunnel Construction, 2019, 39(5): 884-889.
|
[13] |
WANG Shaohua, LIU Quansheng, HUANG Xing, ZHANG Xiaobo.
Realtime Force Monitoring Method for Disc Cutter in TBM Tunneling
[J]. Tunnel Construction, 2019, 39(2): 309-316.
|
[14] |
ZHAI Qianzhi, ZHOU Jianjun, LI Hongbo, WANG Liming.
A Case Study on Double-shield TBM Disc Cutter Wear and Replacement Estimation
[J]. Tunnel Construction, 2019, 39(12): 2081-.
|
[15] |
QIN Yinping, ZHANG Zhuqing, SUN Zhenchuan, CHEN Kui, YANG Yandong.
Analysis and Prediction of TBM Disc Cutter Wear Based on Field Test
[J]. Tunnel Construction, 2019, 39(11): 1914-.
|