Tunnel Construction ›› 2010, Vol. 30 ›› Issue (5): 546-548,553.
• wenzhang • Previous Articles Next Articles
XIE Ming, Meng-Wei
Received:
Revised:
Online:
Published:
Abstract:
It is unfeasible to install a conventional shield arriving shaft in complex urban environment. Regarding the arriving of the shield of the bored running tunnel from Huayuanqiao Station to Baishiqiao South Station on No. 6 Line of Beijing Metro, the proposal of "single shaft + mined cross adit" is made. In addition, screw conveyor disassembly option, shield rotation option, parallel shield moving option and shield hoistingout option are described in detail on basis of the control dimensions of Herrenknecht EPB 6250 EPB shield. This paper can provide reference for similar projects in the future.
Key words: complex environment, shield, arriving shaft, "single shaft + mined cross adit"
XIE Ming, Meng-Wei. Design of Shield Arriving Shaft in Complex Environment[J]. Tunnel Construction, 2010, 30(5): 546-548,553.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/
http://www.suidaojs.com/EN/Y2010/V30/I5/546
Key Technologies of Cutterhead Configuration and Cutter Replacement for Large diameter Shield under High Water Pressure
Fullscale Experimental Study on Bending Performance of Segmental Joints of Large Crosssection Shield Tunnel under Pure Compressive Bending Condition
Launching and Receiving Technology of Large Crosssection Horseshoeshaped Shield Used in Baicheng Tunnel