Tunnel Construction ›› 2010, Vol. 30 ›› Issue (6): 683-686.
• wenzhang • Previous Articles Next Articles
ZHANG Xian-Wei
Received:
Revised:
Online:
Published:
Abstract:
Geological conditions, tunnel design and tunnel construction are analyzed in order to control the large deformation of the tunnel section in carbonaceous slate with high ground stress. Reasonable reinforcement parameters are selected, the surrounding rocks are protected, long bolts and footlocking bolts are installed, the tunnel crosssection is optimized, reasonable deformation is allowed and deformation controlling standards are established. Construction technologies such as timely reinforcement strengthening, short or supershort bench excavation method, immediate reinforcement, immediate reinforcement structure closing and timely lining are adopted, which have brought the deformation under effective control.
Key words: tunnel, high ground stress, carbonaceous slate, large deformation
ZHANG Xian-Wei. Technology for Control of Large Deformation in Carbonaceous Slate Section of Muzhailing Tunnel[J]. Tunnel Construction, 2010, 30(6): 683-686.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/
http://www.suidaojs.com/EN/Y2010/V30/I6/683
Key Technologies of Cutterhead Configuration and Cutter Replacement for Large diameter Shield under High Water Pressure
Experimental Effect Prediction of Ground Conditioning of Water rich Sandy Stratum Based on BP Neural Network
Fullscale Experimental Study on Bending Performance of Segmental Joints of Large Crosssection Shield Tunnel under Pure Compressive Bending Condition
Study on Optimization of Emergency Rescue Station of Yuntunbao Tunnel on ChengduLanzhou Railway
Launching and Receiving Technology of Large Crosssection Horseshoeshaped Shield Used in Baicheng Tunnel
Design and Analysis of a New TBM Propulsion System with Small Turning Radius
Study on Key Technologies and Application of Engineering Big Data Management Platform of Tunnel Boring Machine
Improvement Technology of Bearing Capacity of Prestressed Anchor Cable in Large span Tunnel: a Case Study on Badaling Great Wall Station