[1] |
LI Pengfei, QIU Jinrun, WANG Limin, SHUAI Yubing, WANG Xijun, ZHANG Mingju, WANG Hao.
Mechanized Construction of Wastewater Pump Room in
Shield Tunnel
[J]. Tunnel Construction, 2022, 42(S1): 404-412.
|
[2] |
LIU Zhitao, ZHANG Jingjing, WANG Lichuan, LIU Xupeng, HUA Wei.
Construction Control Technology of Shield Tunneling
underneath BrickandConcrete
Residential Buildings: a Case Study of Phase Ⅲ Project of Hefei Rail Transit Line 1
[J]. Tunnel Construction, 2022, 42(S1): 427-432.
|
[3] |
ZHANG Yazhou, YAO Zhanhu, WEI Chi, ZHANG Xiying, ZHAO Xiaopeng, WU Ronghua, CHENG Xiaoqing.
Discussion on Main Issues of Shield Tunnel
Waterproofing Technology and Its Future Prospect
[J]. Tunnel Construction, 2022, 42(11): 1832-1843.
|
[4] |
KONG Deyu, RAO Junying, MEI Shilong, WANG Yong, ZHAO Shixin, SHE Yuhua.
Construction Mechanical Behavior of Cover Arch Pillar
Method for ShallowBuried and SuperLarge CrossSection Metro Station: a Case Study on Beijinglu Station of Guiyang Metro Line 3 in China
[J]. Tunnel Construction, 2022, 42(10): 1755-1765.
|
[5] |
LIU Jianyou, LYU Gang, ZHAO Yong, YUE Ling.
Environmental Protection Techniques for New Badaling
Tunnel of BeijingZhangjiakou HighSpeed Railway Crossing Scenic and Historic Interest Area
[J]. Tunnel Construction, 2021, 41(8): 1361-.
|
[6] |
ZHANG Junru, WANG Zhiyong, GONG Yanfeng, XU Xiangdong, ZHANG Hang, YE Lun.
Construction Mechanics of Transition Connection
between a SingleSpan
FiveLane Highway Tunnel and Small ClearDistance Tunnel with
ThreeLane Main Tunnel and TwoLane Ramp
[J]. Tunnel Construction, 2021, 41(2): 185-198.
|
[7] |
LIU Yingjing.
Rolling Angle Correction Method for Earth Pressure
Balanced Shield
[J]. Tunnel Construction, 2021, 41(12): 2157-2162.
|
[8] |
YANG Xiuren.
Development Status of and Outlook for Construction
Technology for Prefabricated Metro Stations in China
[J]. Tunnel Construction, 2021, 41(11): 1849-1870.
|
[9] |
LIN Zhi, LIU Wang, CHEN Chuan, JIANG Shuping.
Technological Progress and Frontier Scientific Issues
of Transportation Tunnels in China
[J]. Tunnel Construction, 2020, 40(S1): 1-8.
|
[10] |
DU Chuangdong, ZHANG Jie, WU Yuebin.
Application of Construction Technology of "Tunneling First and Then Station"
in Tel Aviv Red Line Project in Israel
[J]. Tunnel Construction, 2020, 40(4): 562-568.
|
[11] |
JIANG Fuqiang, WANG Zimao.
New Technology of Sliding Formwork Integral Construction for Lining Structure of Rectangular Vertical Shaft
[J]. Tunnel Construction, 2019, 39(S2): 379-384.
|
[12] |
YU Shaohui, GAO Yi, LI Yang, CHENG Peng, WANG Quansheng.
Review and Prospect of Mechanized Construction Technology for Underground Engineering with Large Rectangular Crosssection
[J]. Tunnel Construction, 2019, 39(3): 451-458.
|
[13] |
ZHANG Xuewen.
Countermeasures for Collapse of Taoshuping Tunnel Crossing Waterrich Finesand Strata
[J]. Tunnel Construction, 2018, 38(2): 308-315.
|
[14] |
ZHAO Hui.
Monitoring and Analysis of Construction Mechanics Behavior of Rectangular Tunnel Structure with Large Crosssection in Soft Soil Stratum
[J]. Tunnel Construction, 2017, 37(S1): 46-52.
|
[15] |
YANG Shiwu, PI Sheng, SU Hui, MA Zhaofei.
Construction Technology of Micro Bench Method for Shallowcovered New Loess Tunnel
[J]. Tunnel Construction, 2017, 37(12): 1571-1577.
|