ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2011, Vol. 31 ›› Issue (5): 547-549.
• wenzhang • Previous Articles Next Articles
WANG Jian
Received:
Revised:
Online:
Published:
Abstract: In existing measurement standards, there are no stipulations dedicated for the working details and limits of the thirdparty measurement. In addition to complying with the requirements of relevant standards, the thirdparty measurement has its own special stipulations, due to the characteristics of the mode of its own. The application of the measurement results of the ground control network, the densification of the ground control network, the limit of the thirdparty measurement and the treatment of the limit exceeding are discussed, with the management mode of the thirdparty measurement of the rail transit works in Nanjing as an example. Conclusions drawn are as follows: 1) These stipulations make up the shortcoming of the existing standards and solve many problems in the implementation of the thirdparty measurement of urban rail transit works; 2) These stipulations can meet the requirements of the quality and management of the thirdparty measurement of urban rail transit works; 3) These stipulations are accepted by the Owner, the Contractor and the thirdparty measurement companies.
Key words: urban rail transit work, thirdparty measurement, special stipulation, measurement limit, limit exceeding treatment
王建. Some Issues on Thirdparty Measurement: Case Study on Urban Rail Transit Works[J]. Tunnel Construction, 2011, 31(5): 547-549.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/
http://www.suidaojs.com/EN/Y2011/V31/I5/547