Tunnel Construction ›› 2011, Vol. 31 ›› Issue (5): 598-604.
• wenzhang • Previous Articles Next Articles
CHEN Jinshan, LI Hailong
Received:
Revised:
Online:
Published:
Abstract: The key construction technologies for the connecting between the new structure and the operating Metro station, including the technology for the temporary reinforcement and protection of the operating Metro station, the technology for the stepbystep cutting of the existing structure and the technology for the connecting between the new structure and the existing structure are discussed in detail, with the connecting between Laojie interchange station and the operating Metro station on line 3 of Shenzhen Metro as an example. A kind of static cutting technology, including diamond wire saw technology and diamond hydraulic drill technology, is proposed for the project, which overcomes such difficulties as the complex construction environment, the high technology requirement and the high risks. In the end, the connecting between the new structure and the operating Metro station is executed with high safety and high efficiency.
Key words: new structure, operating Metro station, diamond wire saw, static cutting, connecting between new structure and existing structure
陈进山,李海龙. Key Construction Technology for Connecting between New Structureand Operating Metro Station[J]. Tunnel Construction, 2011, 31(5): 598-604.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/
http://www.suidaojs.com/EN/Y2011/V31/I5/598