ISSN 2096-4498
CN 44-1745/U
Tunnel Construction ›› 2011, Vol. 31 ›› Issue (6): 737-742.
• wenzhang • Previous Articles Next Articles
XING Bo1, YAO Yu2
Received:
Revised:
Online:
Published:
Abstract: In the construction of long tunnels, the air flow at the working face is blocked by the lining formwork trolley, which results in poor working environment. Therefore, new type of lining formwork trolley is developed to improve the working environment. The structure, assembling requirements, labor organization, assistant equipment and assembling procedure of the new type of lining formwork trolley are presented, with the case of the exit section of Funing tunnel on KunmingNanning railway as an example. The assembling practice demonstrates that the assembling method described is efficient, timesaving and flexible and can completely meet the tunneling requirements. The application of the new type of lining formwork trolley can greatly improve the ventilation effects of the tunnel.
Key words: new type of lining formwork trolley, hoisting equipment, formwork assembling
XING Bo, YAO Yu. Technology for Assembling of New Type of Lining Formwork Trolley in Tunnel[J]. Tunnel Construction, 2011, 31(6): 737-742.
0 / / Recommend
Add to citation manager EndNote|Ris|BibTeX
URL: http://www.suidaojs.com/EN/
http://www.suidaojs.com/EN/Y2011/V31/I6/737