ISSN 2096-4498

   CN 44-1745/U

二维码

Tunnel Construction ›› 2011, Vol. 31 ›› Issue (S1): 411-414.

• wenzhang • Previous Articles     Next Articles

Study on Control Mode of Earth Pressure Balance of EPB Shield

LIU Fudong1, GUO Jingbo2   

  1.  (1. Beijing Huasuitong Boring equipment Co., Ltd., Beijing 100081, China;  2. Shijiazhuang Tiedao University, Shijiazhuang 050043, China)
  • Received:2011-06-13 Online:2011-08-05 Published:2011-11-04

Abstract: Tunnel boring machine is a kind of construction machinery which includes machine, electricity, hydraulic, monitoring and control and civil engineering. The earth pressure balance control mode of a EPB shield used in Beijing Subway is analyzed. The control principle is making a proper balance between excavation rate and discharge rate, and making a balance between pressure of chamber and excavation surface. It can reduce strata disturbance and control ground surface settlement. In order to implement earth pressure balance, we should make screw cooperated with propulsion system.

Key words: shield, EPB shield, propulsion system, screw system, autocontrol