[1] |
CHENG Xuesong, XU Liankun, GENG Jia, LI Xiaofan, SONG Yanjie, LU Jiandong, WANG Shuxiong.
Partial Freezing Reinforcement Effect and Influencing
Factors of TJunction of Connection Gallery Bored by
Shield
[J]. Tunnel Construction, 2024, 44(1): 90-99.
|
[2] |
QIAN Hongtao, WANG Yanzhen, YANG Heping, ZHANG Yu, ZHANG Haili, LIU Baodong.
Structural Performance of Corrugated Steel Utility
Tunnel under Internal Suspended Load: a Case Study on the
FirstStage Project of Underground
Utility Tunnel in Wuyi County, Hengshui, China
[J]. Tunnel Construction, 2022, 42(S2): 141-150.
|
[3] |
ZHENG Ligang, CHANG Longfei, JIANG Hua, JIANG Yusheng.
Stress Characteristics of ConcreteFilled
Steel Tubular Column and Surface Deformation in PileBeamArch
Station with Different RiseSpan Ratios of Arch:
a Case Study of
Xiangheyuan Station on Beijing Metro Line 17
[J]. Tunnel Construction, 2022, 42(S1): 174-182.
|
[4] |
LI Taomeng, SUN Haibo, CHEN Qiankun, WANG Xin.
Comparative Analysis of Properties between Two Main
Bearing Seals of LargeDiameter
Shield Tunneling under High Water Pressure
[J]. Tunnel Construction, 2022, 42(S1): 517-525.
|
[5] |
KONG Deshun, LI Quan, GAO Xiangsheng.
Optimum Design for Transport and Adjustment Integrated
Machine for LargeDiameter Lined Steel Tile in
Tunnels
[J]. Tunnel Construction, 2022, 42(11): 1956-1962.
|
[6] |
LIU Xiaochun.
Topological Optimization of Swing Structure of Tunnel
Boring Machine Carried Bolt Drill
[J]. Tunnel Construction, 2022, 42(1): 137-144.
|
[7] |
SONG Yuan, LI Zhaoping, HUANG Mingli, ZHANG Zhien.
Finite Element Analysis on Flexural Performance of Corrugated
Steel Plate Lining Joint in Tunnel
[J]. Tunnel Construction, 2020, 40(S1): 216-224.
|
[8] |
WU Zhongshi, HE Zuhao, LIU Wen, XU Chao, KONG Qian.
Torsionresistant Construction Technology
for Steel Sleeve Used in Launching of Largediameter
Slurry Shield:
a
Case Study of Canapuri River Tunnel in Bangladesh
[J]. Tunnel Construction, 2020, 40(S1): 321-326.
|
[9] |
KONG Deshun, ZHAO Chang, LI Quan, GAO Xiangsheng.
Optimal Design of Lined Steel Pipe Transportation and
Adjustment Integrated Machine in Tunnel
[J]. Tunnel Construction, 2020, 40(9): 1368-1373.
|
[10] |
WU Yanxing, XIAO Wei, ZHOU Qian, SUN Lei, XU Guangyi.
Design and Research of Open Type Rectangular Pipe Jacking Machine
[J]. Tunnel Construction, 2020, 40(4): 591-596.
|
[11] |
ZHANG Zhenyi, CHEN Wuhang, XU Youjun, LI Wenbo.
Finite Element Mechanical Analysis of Metro Station Constructed by Cut and Cover TopDown Method Based on AM Pile
[J]. Tunnel Construction, 2020, 40(2): 189-194.
|
[12] |
HE Zhiyong, ZHONG Hongwu, CHEN Zhenhua.
Safety Evaluation and Finite Element Analysis of Tunnel Lining with Cracks
[J]. Tunnel Construction, 2019, 39(S2): 69-77.
|
[13] |
ZHAO Taidong.
Structural Design and Monitoring Analysis of New-built Mined Tunnel Crossing underneath Existing Metro Station
[J]. Tunnel Construction, 2019, 39(S2): 253-260.
|
[14] |
WANG Song, ZHU Yongzhan, YU Zhirong.
Design of Automatic Hydraulic Support Trolley for Overlapped Shield Tunnel Based on SolidWorks Simulation
[J]. Tunnel Construction, 2019, 39(2): 294-301.
|
[15] |
WANG Kai, ZHANG Lianghui, SUN Zhenchuan, LI Fengyuan, ZHANG Bing, WANG Chaofeng.
Design and Optimization of Counterforce Frame Based on Particle Swarm Optimization Algorithm
[J]. Tunnel Construction, 2019, 39(2): 302-308.
|