[1] |
XU Yulin, DI Xiaoyong, GONG Wen, LIN Zhi, LI Zheyu, YANG Hongyun.
Failure Mechanical Behaviors and Safety Thickness of Reserved Rock Walls in Coal Seam Tunnels
[J]. Tunnel Construction, 2024, 44(1): 126-138.
|
[2] |
LYU Minghao, WEI Chenglin, TANG Xinwei.
Application of LargeDiameter
Metro Jet System in Shield Crossing Underground
Passage with Low Clearance: A Case Study of Airport T1~T2 Section on XintangBaiyun AirportGuangzhou North Railway Station of Intercity
Railway in Pearl River Delta
[J]. Tunnel Construction, 2023, 43(S1): 434-442.
|
[3] |
WANG Jinfeng.
Prediction and Optimization Control of Deformation of
Existing Tunnel Induced by Undercrossing of Shield Tunnel
Based on Particle Swarm OptimizationRandom ForestNondominated Sorting Genetic
Algorithm Ⅱ
[J]. Tunnel Construction, 2023, 43(5): 745-753.
|
[4] |
YU Dongdong, LI Zhongchao, LIANG Rongzhu, ZHANG Zhiwei, MEI Jiaoxin, XIAO Mingzhao, WU Wenbing, GAO Kun.
Coupling Analysis of Longitudinal Deformation of
Shield Tunnel Caused by Overcrossing Tunneling in Layered Soils
[J]. Tunnel Construction, 2023, 43(5): 804-815.
|
[5] |
TANG Xuan, SHAO Xiaokang, XIE Wei, FU Xiaofeng, CHEN Yue, CAI Zifeng, ZHANG Lei.
Performance Test of Clay Shock and Its Application in
Shield Undercrossing Construction
[J]. Tunnel Construction, 2023, 43(4): 602-610.
|
[6] |
WANG Leming, TANG Guorong, MENG Qingyu, MA Zhifu, GONG Jiangfeng.
Overall Design of Chongming-Taicang
Yangtze River Crossing Tunnel of Shanghai-Chongqing-Chengdu High-Speed Railway
[J]. Tunnel Construction, 2023, 43(12): 2098-2113.
|
[7] |
WANG Jinfeng, XIE Qiyong, XU Jinbin, LI Jieyuan, WANG Pan.
Micro Settlement Control Technology for Shield Tunnel
Closely Crossing Underneath Existing Metro Tunnel
[J]. Tunnel Construction, 2022, 42(S2): 372-380.
|
[8] |
YANG Hui, PEI Junhao, ZHU Jibin, LIU Ning, JIANG Xiaobo, LAI Qingzhao.
Construction Safety Technology of ShallowBuried
LargeCrossSection Tunnel Portal Crossing Underneath Operational Highway
[J]. Tunnel Construction, 2022, 42(S2): 440-448.
|
[9] |
LIANG Mengchang, BAI Xuefeng.
Deformation Control Technology of Shield Tunneling
Above a Water Transfer Tunnel in SandyCobble Strata
[J]. Tunnel Construction, 2022, 42(S2): 458-466.
|
[10] |
LI Pengfei, QIU Jinrun, WANG Limin, SHUAI Yubing, WANG Xijun, ZHANG Mingju, WANG Hao.
Mechanized Construction of Wastewater Pump Room in
Shield Tunnel
[J]. Tunnel Construction, 2022, 42(S1): 404-412.
|
[11] |
LIU Zhitao, ZHANG Jingjing, WANG Lichuan, LIU Xupeng, HUA Wei.
Construction Control Technology of Shield Tunneling
underneath BrickandConcrete
Residential Buildings: a Case Study of Phase Ⅲ Project of Hefei Rail Transit Line 1
[J]. Tunnel Construction, 2022, 42(S1): 427-432.
|
[12] |
ZHANG Yazhou, YAO Zhanhu, WEI Chi, ZHANG Xiying, ZHAO Xiaopeng, WU Ronghua, CHENG Xiaoqing.
Discussion on Main Issues of Shield Tunnel
Waterproofing Technology and Its Future Prospect
[J]. Tunnel Construction, 2022, 42(11): 1832-1843.
|
[13] |
ZHANG Qing, WANG Hongchao, ZHAO Yao, SHAO Jingqi, GAO Ziming, ZHANG Lianzhen, CHEN Jian, WANG Chong, YU Lei.
Stability Analysis of New Tunnel Obliquely Crossing underneath Adjacent Existing Tunnel with Small Angle: a
Case Study of a Tunnel of Qingdao Metro Line 8
[J]. Tunnel Construction, 2021, 41(S2): 199-208.
|
[14] |
TU Zhiyi, CHEN Tao.
Research and Application of Underpinning Technology of
Pile Foundation by Longitudinal WallBeam in Mined Tunnel
[J]. Tunnel Construction, 2021, 41(S2): 398-407.
|
[15] |
WANG Yun.
Key Construction Technology of Tunnel Boring Machine
Crossing underneath Existing Building in Composite Rock
Strata: a Case Study of Central Park East StationCongyansi Station on Chongqing Rail Transit Line 9
[J]. Tunnel Construction, 2021, 41(S2): 520-526.
|